60 MW
Installed capacity
San Manuel, Pangasinan
Philippines
6,430*
tCO2e
Annual emissions avoided
2,210*
Homes powered
Pangasinan Solar utilized ground-mounted solar photovoltaic panels, and will be directly connected to the grid through a 2-km transmission line to the NGCP 69kV San Manuel Substation. As ACEN’s first renewable energy project in Pangasinan, the solar farm aims to boost the province’s local economy with the creation of an estimated 1,000 jobs during the its construction phase.
*based on net attributable figures as of Dec 2024
Highlights
ACEN economic stake:
100%
Project status: Under construction
Target date of completion: 2024