40 MWh
Installed capacity
Alaminos, Laguna
Philippines
9,580
tCO2e
Annual emissions avoided
3,290
Homes powered
Alaminos Energy Storage aims to help enhancing the grid’s stability and reliability by storing power when demand is low and feeding it back into the grid when the demand is high. Together with Alaminos Solar, its is the first hybrid solar-battery storage project in the Philippines.
*based on net attributable figures as of Dec 2024
Highlights
ACEN economic stake:
100%
Project status: Operating
Start of commercial operations:
2023
Plant specifications:
2.5 MVA Battery Capacity; 24 units