40 MWh
Installed capacity
Alaminos, Laguna
Philippines
11,880
tCO2e
Annual emissions avoided
9,460
Homes powered
Alaminos Energy Storage aims to help enhancing the grid’s stability and reliability by storing power when demand is low and feeding it back into the grid when the demand is high. Together with Alaminos Solar, its is the first hybrid solar-battery storage project in the Philippines.
*based on 2025 attributable output
Highlights
ACEN economic stake:
100%
Project status: Operating
Start of commercial operations:
2023
Plant specifications:
2.5 MVA Battery Capacity; 24 units