
54 MW
Installed capacity
San Lorenzo, Guimaras
Philippines
53,880*
tCO2e
Annual emissions avoided
42,900*
Homes powered
The first wind farm in the Visayas region, the 54 MW Guimaras Wind Farm generates over 120 gigawatt-hours of electricity annually, which can sustain the energy demand of over 48,000 households. It was developed to heed the higher energy demand in the province due to the surge in infrastructure and economic progress.
*based on 2025 attributable output
Highlights
ACEN economic stake:
100%
Project status: Operating
Start of commercial operations:
2014
Wind turbine specifications:
2 MW Gamesa WTG, 27 units
Recognition/s:
2021 Top Tourist Destination,
Guimaras Provincial Tourism Office




