First wind farm in the Visayas

  • AC Energy 54 MW wind farm in Guimaras
  • Guimaras wind AC Energy
  • ACEN wind farm in Guimaras
  • icon-capacity-wind
    54 MW
    Installed
    Capacity
    plant location
    San Lorenzo, Guimaras
    Philippines
    emissions avoided
    55,706*
    MT CO2e
    Annual Emissions Avoided
    home powered
    20,920
    Homes Powered

A pioneering renewable energy project in the Visayas region, the 54 MW Guimaras Wind Farm generates over 120 gigawatt-hours of electricity annually, which can sustain the energy demand of over 48,000 households. It was developed to heed the higher energy demand in the province due to the surge in infrastructure and economic progress.

*as of Dec 2021

contact