Maharashtra CI Hybrid Solar Wind web logo

153 MW

Installed Capacity

Narangwadi, Maharashtra

India

27,400*

tCO2e
Annual carbon avoidance

28,630*

Homes powered

This 153 MWdc (115 MWac) project is ACEN’s first hybrid wind-solar and round-the-clock asset that will deliver clean and dispatchable higher CUF power to commercial and industrial (C&I) customers in Maharashtra, India.

Hybridization optimizes multiple renewable technologies mix to meet customers’ load requirements. This is a result of ACEN’s partnership with Yanara (formerly BrightNight), which aims to develop over 1.2 GW of hybrid renewable energy to help India progress towards its energy transition goal.

*based on 2025 attributable output

Highlights

Approx. economic stake:

80%

Project status: Operating

Start of commercial operations: 2026

Technical specifications:

Emmvee wind turbines
Jinko solar panels

Partners:

Yanara