
153 MW
Installed Capacity
Narangwadi, Maharashtra
India
27,400*
tCO2e
Annual carbon avoidance
28,630*
Homes powered
This 153 MWdc (115 MWac) project is ACEN’s first hybrid wind-solar and round-the-clock asset that will deliver clean and dispatchable higher CUF power to commercial and industrial (C&I) customers in Maharashtra, India.
Hybridization optimizes multiple renewable technologies mix to meet customers’ load requirements. This is a result of ACEN’s partnership with Yanara (formerly BrightNight), which aims to develop over 1.2 GW of hybrid renewable energy to help India progress towards its energy transition goal.
*based on 2025 attributable output
Highlights
Approx. economic stake:
80%
Project status: Operating
Start of commercial operations: 2026
Technical specifications:
Emmvee wind turbines
Jinko solar panels


