Masaya Solar Logo

420 MW

Installed capacity

Khandwa, Madhya Pradesh

India

332,460*

tCO2e
Annual emissions avoided

114,720*

Homes powered

The 420 MWp (300 MWac) Masaya Solar is located in the Khandwa District, State of Madhya Pradesh, and is set to produce 691 GWh of renewable energy per year while avoiding approximately 635,720 MT of CO2 emissions annually. The project created approximately 500 jobs during its construction stage.

*based on net attributable figures as of Dec 2024

Highlights

Approx. economic stake:

80%

Project status: Operating

Start of commercial operations: 2024

Partners:

UPC Renewables