ACEN’s first development
in Australia

  • 520-MW-New-England-Solar-farm---ACEN-Australia_2

New England Solar

  • icon-solar-1
    521 MW
    Installed
    Capacity
    plant location
    Uralla, New South Wales
    Australia
    emissions avoided
    1,500,000*
    MT CO2e
    Annual Carbon Avoidance
    home powered
    300,000*
    Homes Powered

Located in Uralla, New South Wales, New England Solar farm’s combined stage 1 and 2 are expected to power 300,000 Australian homes each year once the project is completed. The 521 MWdc (400 MWac) first stage was officially opened in early 2023, while construction for the second stage 416MWdc (320MWac) and the 200 MW/400 MWh (2-hour) Battery Energy Storage System (BESS) is now in full swing.

Read more about ACEN Australia’s projects

*projected annual figures

contact