Acen tech hub logo

4 MW

Installed capacity

Mariveles, Bataan

Philippines

4,780*

tCO2e
Annual emissions avoided

3,810*

Homes powered

The adoption of emerging technologies play a prominent role in ACEN’s renewables expansion. At the ACEN Tech Hub in Bataan, different energy and energy storage technologies will be tested for possible large-scale use in the Philippines.

*based on 2025 attributable output

Highlights

ACEN economic stake:

100%

Project status: Operating

Start of commercial operations:
2022

Plant specifications:

Renewable energy research facility